TVC Tower

High-angle view of the circular TVC Tower, showing its architecture and central courtyard

Project Brief

  • Project Deliverables:
    • Architectural,
    • Structural and MEP BIM models
    • MEP installation drawings
  • Services: BIM Modelling, BIM Coordination
  • Turnaround: 200 days
  • Area: 66000 Sq. M.
  • LOD: 350

Responsibilities

From the given input drawings, Tesla had to create:

  • Architectural 3D model
  • Structural 3D model
  • MEP 3D model
  • Coordination of different disciplines
  • MEP installation drawings

Challenges

  1. Midway through the project, the deadline was postponed. From a quoted time of 300 days, the client requested the project to be completed in 200 days.
  2. There were several clashes in the models, requiring major design changes.

Solution

  • The team working on the project was increased, and resources were managed accordingly, with additional hours put in to meet the deadline.
  • The design modifications were suggested by Tesla and were approved by our clients.